网友上传亚洲无码乱视频_亚洲综合久久一区二区_最新国产自产视频_麻豆免费看在线观看av

News

Sewage pool reverse hanging membrane structure

Share:
Hits: 1631 Publication time: 2018-12-05 SML

With the improvement of environmental awareness, chemical, pharmaceutical companies, and surrounding the cities sewage treatment plant in the treatment of sewage produced during the stench gas has gradually become a problem can not be ignored, in order to minimize the influence of the sewage treatment plant on the surrounding environment to sewage treatment plant structures build (cover) deodorant is imperative.



Sewage pool deodorant body system of cell body stench gas collecting the effective method is to affix a seal, sewage pool travel through the air inlet and air outlet, the stench on-demand pumped gas deodorization treatment was conducted on the intellectual device.



Steel skeleton + reverse hanging sealed membrane structure features:

1, use fixed number of year long: steel structure used for 50 years, membrane structure used for 15 years.

2, suitable for large span

3, simple

4, fast installation;

5, maintenance is convenient;

6, sealed performance is good;

7, modelling is rich













Key words:
Relevant information

Service Hotline0755 27809070

Shenzhen: 2nd floor Huizhou, Baoan Xixiang Baoyunda Logistics Research and Development Center, Shenzhen: 8th floor, Block B, Jinhaoyuan Building, Huiyang District, Huizhou City, Guangdong Province
Email: folan@sz1680.com
Copyright 2018 Shenzhen Folan Space Membrane Structure Co., Ltd. all rights reserved.
Guangdong ICP prepare No. 18128411 -1
Technical support: 國(guó)人在線(xiàn) Disclaimer Website map

WeChat 2D code